Templates

  • Print the Template
    Print the template on any standard printer that uses 8.5 x 11-inch paper.

  • Understand the Markings

    • The template includes a top and bottom label to help with correct placement.

    • Blue dots indicate seal support hole locations.

    • Two orange lines show where the hinges should be spaced apart.

  • Prepare the Template for Alignment

    • Cut out the areas labeled “cut on dotted line.”

    • This allows the template to align accurately with the lines drawn on the boards and the separation point between the two boards.

  • Position the Boards

    • Cut and arrange the boards into their final positions for the dam configuration.

    • Place the template on top of the boards, making sure all lines match up.

    • Tape the template in place to hold it steady.

  • Mark and Drill Hinge Holes

    • Place the hinges over the orange guideline labeled “top” and “bottom.”

    • Make sure the hinge knuckle is even with the line.

    • Mark the screw hole locations through the hinge.

  • Finish the Boards

    • Drill the holes at the marked points.

    • Paint each section of the boards, including inside the drilled holes, to seal and protect them.

error: Content is protected !!