T-nuts

  • Install T-nuts into each drilled hole after the paint dries.
  • Lightly hammer T-nuts for a secure fit.
  • Reinforce wood to prevent collapse when tightening screws.
  • Increase resistance against floodwater pressure.
  • Ensure screws do not extend beyond the T-nuts.
  • Prevent structural compromise and installation issues.
  • Verify secure fastening and alignment for durability.
  • Enhance material longevity and flood resistance.
  • When mounting to the structure, t-nuts should be mounted on the outside of the dam
  • When mounted to L brackets, t-nuts should be mounted to the inside of the dam
error: Content is protected !!