Skip to content
Menu
Introduction
FYI
Dam Height
Surfaces
Items Needed
Dam Options
Measuring
Garage Measurments
Template
Drilling Holes (Dam)
Installing
Drilling Concrete
Drilling Wood
Painting
T-nuts
Hinges
Weather Stripping
Splicing
Structure weather stripping
Textured floor weather stripping
Frame Weather Stripping
Seal Support
Stacking Dams
Rain Guard
Entry Door
Garage Door
Glass Door
Testing Dam
Storing Dam
<Previous
|
Next>
Decide whether to create custom door dams per order or maintain an inventory that can be customized at the time of sale.
Protect the weather stripping on each dam component to ensure durability.
Use 4- to 5-inch sections of parting bead as spacers to prevent the weather stripping from resting against other components during storage.
Secure each spacer to the dam component using Velcro:
Remove the spacers when the dam is ready for use and store them separately.
Reattach the spacers when the dam is no longer in use and ready for storage.
Ensure that no weather stripping faces outward during storage to avoid unnecessary wear or damage.
error:
Content is protected !!