Install T-nuts into each drilled hole after the paint dries.
Lightly hammer T-nuts for a secure fit.
Reinforce wood to prevent collapse when tightening screws.
Increase resistance against floodwater pressure.
Ensure screws do not extend beyond the T-nuts.
Prevent structural compromise and installation issues.
Verify secure fastening and alignment for durability.
Enhance material longevity and flood resistance.